|
|
|
| |
Ongoing Projects |
Name of work |
: |
Hayat Kimya 45 mt depolama sistemi secondary structure (1.900 ton) |
Start Date |
: |
01.02.2011 |
Final Completion |
: |
|
Cost of Construction |
: |
4.000.000 TL |
|
|
Name of Work |
: |
Pimsa Polüretan A.Ş. Çelik kons. İşleri ve cephe kaplama işi (120 ton) |
Start Date |
: |
01.04.2011 |
Final Completion |
: |
|
Cost Of Construction |
: |
300.000 TL |
|
|
Name of Work |
: |
Reysaş Logistics Orhanlı Ve Çayırova Depo İnşaatı (600 Ton) |
Start Date |
: |
04.04.2011 |
Final Completion |
: |
|
Cost Of Construction |
: |
1.440.000TL |
|
|
Name of Work |
: |
Snop metal A.Ş. Çelik kons. İmalat ve montaj işleri (280 ton) |
Start Date |
: |
08.03.2011 |
Final Completion |
: |
|
Cost Of Construction |
: |
700.000TL |
|
|
Name of Work |
: |
Balıkesir Karaağaç Pazaryeri İnşaatı 1800 m2 |
Start Date |
: |
08.05.2011 |
Final Completion |
: |
|
Cost Of Construction |
: |
270.000 TL |
|
|
Name of Work |
: |
Adapazarı Spor Kompleksi |
Start Date |
: |
10.07.2011 |
Final Completion |
: |
|
Cost Of Construction |
: |
1417.000 TL |
|
|
| |
|
|
| |
|
|